School:
Greenwood HS New Facility Dedication (13 Nov 1960)
Email: Comstock@Stateline-ISP.com
Surnames: Madic, Plautz,
Miller, Rohde, Raalte, Egbert, Wuethrich, Braun, Christie, Meinhardt, Hribar,
Dusso, Hemersbach, Neuenfeldt, Govek, Lamovec, Fonstad, Miron, Peroshek, LeVee,
Wadleigh, Barba, Buker, Cissna, Horn, Johnson, King, Korn, Meyers, Miller,
Oldroyd, Olson, Schwellenbach, Turnquist, Wagner, Rodgers, Channing, Berrett,
Mazola, Sorenson, Liebzeit, Albert, Fravert, Grottke, Switlick, Syth, Klancher,
Harder, Englebretson, Timmler, Dallman, Jackson, Hare, Severson, Worden, Kesler,
Meinholdt, Abel, Klinke, Brumbaugh, Cox, Gatz, Jasurda, Susa, Ulesich, Worden,
Bayuk, Lamovec, Nielsen, Tieman, Huim, Krei
----Sources: Comstock Family Collection; Photo from the Steve Roberts Postcard Collection.
Dedication
New Greenwood Community High School
Greenwood, Wisconsin, November 13, 1960
Here’s what you bought….
New, modern high school facilities that will serve the young people of this area
for many years, plus additional, newly remodeled elementary rooms.
The new high school addition extends over 198 feet west of the old building and
is 75 feet wide, except in the shop areas where the building is 30 feet wider.
The two story addition has 32,848 square feed of area as compared to the 26,195
square feet in the old building’s three floors and gymnasium.
The new high school addition has (a) thirteen classrooms including two fully
equipped, up to date science laboratories, a three room commercial department,
an agriculture classroom and a drafting and art room; (b) a beautiful, large
library with work rooms; (c) two large well equipped shops, one for industrial
arts and the other for vocational agriculture; (d) a modern oil-fired hot water
heating system that serves both the new addition and the old building; (e) new
shower and dressing rooms; (f) adequate office space in which to conduct the
business of the school district; (g) a teachers’ room and conference room; (h) a
large, sound proofed music room with individual practice rooms and an instrument
and uniform storage room; (i) washrooms on each floor.
The old building has been remodeled to provide (a) nine large cheerful grade
classrooms; (b) a cafeteria and hot lunch kitchen that at present serves over
300 lunches a day; (c) new enlarge washrooms; (d) a teacher workroom and
materials center.
They made the decisions…..
Building a school that must serve hundreds of young people for the next fifty
years or more is a tremendous responsibility. It involves hundreds of decisions,
few of them easy. The burden of these decisions, after the electors of the
district have voted to build, is borne by the members of the Board of Education
and the school administrator. At present, Board members are: Allen Wuethrich,
Director; Clayton Braun, Clerk; Arthur Christie, Treasurer; Clarence Meinhardt,
Joseph Hribar.
The first Board of Education elected to serve the Greenwood Community School
District in 1957 included Loris Dusso, Director; Alfons Hemersbach, Clerk;
Albert Neuenfeldt, Treasurer; Frank Govek and Henry Lamovec.
The district’s school administrator throughout the formation of the new school
district and the building project has been Clifton Fonstad, Superintendent of
Schools.
Points of interest…TOUR GUIDE
Many important features of the new high school addition are not readily
apparent, such as the fire resistant construction, the hot water heating system
that provides filter cleaned fresh, warmed air throughout both the new addition
and the old building, and the modern, enameled steel panel and aluminum
construction. But many features are things that you can see for yourself.
You will notice the cheerful color schemes that have been used throughout to add
beauty and provide an attractive place in which to work. The drab cinder blocks
have been transformed into colorful walls with rubber based masonry paint.
The ceramic tiled floors and the hard surfaced iron spot brick walls in the
washrooms and shower rooms, the aluminum window frames, and the enameled steel
panels require a minimum of maintenance and will stay new looking for many
years.
Individual science experimentation is now possible in the two beautiful science
laboratories. These labs have as fine equipment as can be found. The tops of the
desks in the chemistry-physics lab are made of stone that is is ipervious to
acids, chemicals and heat.
Chalkboards are made of tempered glass. They not only provide an excellent
writing surface that is easily seen, but are practically indestructible.
All clocks in the new building are controlled by a master clock in the office.
They correct themselves every hour. Over two miles (12,000 feet) of wire was
used in connecting up this system.
Good lighting is important in any school and ours has the best. 532 four foot
fluorescent light fixtures using almost 1,100 fluorescent tubes have been used
in the new building and remodeled portions of the old building.
Plastic sky domes in the upper corridors and washrooms make it possible to use
natural light in these areas that are windowless and normally require artificial
lighting all the time.
New chairs and chair desks have been selected for comfort, durability and ease
of maintenance. The colorful seats, backs and desk tops are solid plastic that
will stay looking nice.
The enameled steel wall panels are only one inch thick but sealed in fiber glass
insulation makes them as effective a heat barrier as an eight inch block wall.
All electric office equipment of the future will be no problem in the commercial
rooms that have been wired for its use. Room 206 is also wired for use of sound
equipment in teaching languages.
What it will cost…..
Because the building project is not yet fully complete, and the remodeling and
equipping will be done over a period of several years, it is impossible at this
time to determine just what the total cost will be exactly. The major cost,
however, is shown in the basic contracts for the high school addition and some
remodeling in the old building, which are as follows:
General Contractor
P.G. Miron Construction Co., Appleton $252,386.00
Heating and Ventilation
Star Plumbing and Heating Co., Fond du Lac 102,895.00
Plumbing
Thorp Pipe and Supply Co., Thorp 49,952.60
Electrical Work
Peroshek Electric, Greenwood 34, 783.00
Sub total $440,016.60
Architect
Raymond N. LeVee and Associates, Appleton $ 26,401.00
Legal and Supervisory Services 4,100.00
Total $470,517.60
One can only estimate what the costs of completing the remodeling and equipping
the new addition and grade building will be when finally finished. Some of this
has been done already and the remainder will be done in the future. The science
laboratories have been equipped more completely than originally planned because
of the aid available through the National Defense Education Act which amounted
to about 60% of the cost of this equipment. Much of the remodeling and
modernizing is work that would have to be done regardless of the building
project such as the new heating system in the old building, the new lighting and
modernized wiring, new washrooms and ceiling and floor tile. Estimates of what
might be necessary to complete the remodeling and equipping are as follows:
Equipment and Furniture
Science lab equipment $14,000.00
Industrial arts equipment 9,000.00
Seating, desks, furniture 5,000.00
Hot lunch equipment 6,000.00
Shelving, misc. equipment 1,200.00
Remodeling 29,500.00
Site improvement 2,600.00
This is your staff…
ADMINISTRATORS: Clifton Fonstad, Superintendent, V.J. Wadleigh, Principal
HIGH SCHOOL TEACHERS: Mrs. Lorraine Barba, Home Economics; Cyril Buker,
Physical Education, Coach; Joe Cissna, Social Science, History; Mrs. Lois Horn,
Commercial; Mrs. Marion Johnson, English; Mrs. Frederica King, Physical
Education; Donald Korn, Science, Mathematics; Leniel Meyers, Mathematics; Lee
Miller, Music; Richard Oldroyd, Sciences; Mrs. Mona Olson, English, Librarian;
Clyde Schwellenbach, Industrial Arts; James Turnquist, Civics, History, Ass’t.
Coach; Victor Wagner, Agriculture
ELEMENTARY TEACHERS
Greenwood-
Mrs. Irene Rodgers, 8th grade; Harry Channing, 8th grade; Mrs. Geneva Berrett,
7th grade; Mrs. Belle Mazola, 7th grade; Mrs. Eva Christie, 6th grade; Mrs.
Esther Sorenson, 5th grade; Mrs. Mercedes Liebzeit 4th grade; Mrs. Leona Albert,
3rd grade; Mrs. Ferne Neuenfeldt, 1st grade; Mrs. Linda Grottke, Art & Music
Supervisor
Willard-
Vincent Switlick, 5th-6th grades; Mrs. Ruby Syth, 3rd-4th grades; Mrs. Frieda
Klancher 1st-2nd grades
Eaton Center-
Mrs. Joan Harder, 4th-6th grades; Mrs. Irene Englebretson, 1st-3rd grades
Benjamin- Mrs. Rose Timmler, 1st-3rd grades
Braun Settlement – Mrs. Jessie Johnson, 4th-6th grades
Rocky Run – Mrs. Rose Dallman, 1st-6th grades
MAINTENANCE STAFF
Einar Jackson, Mrs. Leona Syth, Merrill Hare, Mrs. Eva Severson (Willard)
SECRETARIES
Mrs. Jean Worden, Mrs. Joanne Kesler
HOT LUNCH COOKS
Mrs. Josephine Meinholdt, Mrs. Anita Abel, Mrs. Olive Klinke
PUPIL TRANSPORTATION
Edwin Brumbaugh, Lawrence Cox, John Gatz, John Jasurda, Delmond Johnson, Giles
Susa, Joseph Ulesich, Robert Worden, William Bayuk, Frank Lamovec, Henry
Meinhardt, Henry Nielsen, Don Tieman Jr., Kenneth Huim, Ted Krei
© Every submission is protected by the Digital Millennium Copyright Act of 1998.
Show your appreciation of this freely provided information by not copying it to any other site without our permission.
Become a Clark County History Buff
|
|
A site created and
maintained by the Clark County History Buffs
Webmasters: Leon Konieczny, Tanya Paschke, Janet & Stan Schwarze, James W. Sternitzky,
|